Quote Originally Posted by DetroitRises View Post
It was announced in May that construction is on hold 3-6 months for Monroe blocks, while bedrock sorts out the logistics of building both the Hudson’s and Monroe blocks at the same time.
Which means they read to start construction by 2022.