Belanger Park River Rouge
NFL DRAFT THONGS DOWNTOWN DETROIT »



Results 1 to 25 of 32

Hybrid View

  1. #1

    Default

    We just had a post about this not too long ago.
    http://detroit.curbed.com/archives/2...start-date.php

  2. #2

    Default

    Quote Originally Posted by Zads07 View Post
    We just had a post about this not too long ago.
    http://detroit.curbed.com/archives/2...start-date.php
    Thanks
    With the recent success at the Broderick, the Whitneys 108 apartments look like a good bet to be filled.
    Also a people mover station will upgraded to allow access to the building.
    I hope they secure all financing and begin in the fall!

  3. #3

    Default

    No problem, I wrote the article I posted above and that is exactly what they told me. Groundbreaking in September for sure, just not a specific date yet.

  4. #4

    Default

    Quote Originally Posted by kenp View Post
    Thanks
    With the recent success at the Broderick, the Whitneys 108 apartments look like a good bet to be filled.
    Also a people mover station will upgraded to allow access to the building.
    I hope they secure all financing and begin in the fall!
    This business about the PM station is the third time it has been mentioned in the last month. The station already connects to the building - it is just locked since the building is empty. If you peek through the doors from the platform, the turnstyles are still sitting there. That's also why this is the only station w/o elevator access - the elevators are in the building.

    Hopefully the part in the building will be at least spruced up, but I'm confused why it is being touted as a 'renovation' or 'upgrade' to allow access to the building.

  5. #5

    Default

    Quote Originally Posted by cramerro View Post
    Hopefully the part in the building will be at least spruced up, but I'm confused why it is being touted as a 'renovation' or 'upgrade' to allow access to the building.
    Well, unlocking the doors would be a nice upgrade.

  6. #6

    Default

    Name:  _DSC5650.jpg
Views: 979
Size:  56.5 KB David Whitney Building

  7. #7

    Default

    Name:  _DSC5652.jpg
Views: 911
Size:  53.9 KBDavid Whitney Building

  8. #8

    Default

    Name:  _DSC5664.jpg
Views: 948
Size:  71.6 KBDavid Whitney Building. These files are reduced in resolution by 25% to accommodate file size limitation requirements.

  9. #9

    Default

    Name:  _DSC5665.jpg
Views: 956
Size:  73.6 KBDavid Brodrick Tower as seen from David Whitney Building.

  10. #10

    Default

    Name:  _DSC5692.jpg
Views: 948
Size:  73.3 KBDavid Whitney Building looking south.

  11. #11

    Default

    Name:  _DSC5696.jpg
Views: 925
Size:  59.5 KBDavid Whitney Building looking south.

  12. #12

    Default

    Name:  _DSC5712.jpg
Views: 929
Size:  100.8 KBDavid Whitney Building looking east.

  13. #13

    Default

    Name:  _DSC5714.jpg
Views: 936
Size:  92.2 KBDavid Whitney Building looking south at downtown Detroit MI.

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Instagram
BEST ONLINE FORUM FOR
DETROIT-BASED DISCUSSION
DetroitYES Awarded BEST OF DETROIT 2015 - Detroit MetroTimes - Best Online Forum for Detroit-based Discussion 2015

ENJOY DETROITYES?


AND HAVE ADS REMOVED DETAILS »





Welcome to DetroitYES! Kindly Consider Turning Off Your Ad BlockingX
DetroitYES! is a free service that relies on revenue from ad display [regrettably] and donations. We notice that you are using an ad-blocking program that prevents us from earning revenue during your visit.
Ads are REMOVED for Members who donate to DetroitYES! [You must be logged in for ads to disappear]
DONATE HERE »
And have Ads removed.