Quote Originally Posted by DetroitSoldier View Post
I would assume spending $15-$20M to tear down the existing structure and reincorporate parking into the new space would be preferential to being limited by physical and design aesthetics.
hmmm. i don't see the demand to warrant tearing down the MOT ramp and office structure that has paying tenants [[LE&A + KDG).

perhaps MOT is dangling the unassigned parking spaces in the ramp as dedicated parking to a hotel/office tenant in the new proposal.