Yes, it is at the same intersection across Canfield from the Auburn. The original plan for the South University Village District called for Phase 2 to begin much earlier than this, before the Auburn was even a pipe dream [[prior to the Auburn there was talks of a Ace or Aco or some other hardware store on the Auburn's lot which never materialized)
Phase I is Studio One.
And if all goes well Phase 3 they originally stated is going to be the gravel lot at Forrest / Cass.
Bookmarks