Quote Originally Posted by Khorasaurus View Post
Yeah but the cost of the 94 widening is 2.7 billion because it is more thorough than the 75 widening [[1 billion price tag).

Was 96 through Livonia part of this as well? I thought that was a previous plan.
ah. I was thinking in distances being widened and lane miles of capacity , not dollars. Also, the 94 work is a lot of bridge replacement and exit/entrance fixes too...right? I mean widen or not, the bridges are getting replaces and the entrances are getting fixed.