Truth be told, Chrysler could have built their tower in downtown Detroit and razed their HP campus and built the tech center there. But Auburn Hills gave them the sun, the moon and thirty pieces of silver to move there so they did. GM's setup of having the headquarters based in Detroit and have the Tech Center in Warren has worked for decades. It could have worked for Chrysler.