According to the Detroit News the refurbishment of the David Stott tower is complete in downtown Detroit. Almost 90 years after the building was opened way back in the early part of the 20th century. We can thank Bedrock for this effort and I'm almost positive the demand for high rise residential in regards to this building is a contributor to the dramatic change in the Hudson Block development and also the significant delay in whatever is built on the Monroe Block development. Maybe just not enough demand for high price condos and rentals in downtown Detroit.