    Default I-75 Mega-Project Update [[Oakland County)

    Hello Folks!

    I attended the I-75 Phase Three open house today. I was able to get a lot of interesting information. Here are the highlights:


    • A tunnel boring machine will be used to make the underground rain storage pipe.
      • The TBM will be inserted in the northeast quadrant of the I-75\I-696 interchange and the tailings will be brought to that location.
      • The tunnel will go as far north as 12 Mile and as far south as Meyers [[8.5 Mile).
      • The tunnel will be for rain water only. It will be able to store an entire 100 year storm without discharging any of it. It can then wait to discharge the water until after things have calmed down.
      • This water won't need to get treated like the rainfall does today, because the current system is a combined system.
      • This tunnel will help reduce the chances of basement flooding for the 12 Towns Drain system.

    • The need for pumping stations will be eliminated in many locations except for where the tunnel pumps out at the Red Run drain
    • Madison Heights has asked that a Diverging Diamond Interchange [[DDI) be considered for the 12 Mile Road interchange [[An example of a DDI would be University Drive over I-75)
    • Work starts later this year but doesn't really ramp up until 2020
    • The project will be done in four segments and will wrap up in 2023, the four segments are as follows:
      • 2020: Northbound I-75 from 8-Mile to I-696
      • 2021: Southbound I-75 from I-696 to 8-Mile
      • 2022: Northbound I-75 from I-696 to 13 Mile Road
      • 2023: Southbound I-75 from 13 Mile Road to I-696

    • Temporary paving and the removal of the Dallas Street bridge will be done in 2019. Dallas Street is the first bridge north of the I-75 and I-696 interchange, it is being removed and will not be replaced.
    • I-75 will have 5 lanes in each direction from I-696 to 8-Mile. Currently that section has 4 lanes in each direction.
    • During construction two lanes in each direction will be maintained by pushing the traffic to one side of the freeway and using crossovers


    I hope that information is accurate and complete as possible. If anyone has questions I'd be happy to answer them if I'm able.

    Take care!

  2. #2

    Default

    This is great information thank you! Would love to see what the design is going to look like.

    Still waiting on the final design for i94, but that should be ready by fall.

  3. #3

    Default

    Great update. While I'm not a huge fan of expanding highways for a stagnant population that doesn't have a terrible traffic problem, a diamond interchange at 12 Mile would be nice.

    Trying to merge from 12 mile heading east on to northbound I-75 is a fun choice between flipping your car trying to get up to speed or merging at 40MPH because that ramp is so small.

  4. #4

    Default

    Quote Originally Posted by EGrant View Post
    Great update. While I'm not a huge fan of expanding highways for a stagnant population that doesn't have a terrible traffic problem, a diamond interchange at 12 Mile would be nice.

    Trying to merge from 12 mile heading east on to northbound I-75 is a fun choice between flipping your car trying to get up to speed or merging at 40MPH because that ramp is so small.
    Oakland County is on pace to grow their population by 5% this decade

  5. #5

    Default

    Quote Originally Posted by Luke09 View Post
    Oakland County is on pace to grow their population by 5% this decade
    They were referring to the population of the region.

    The growth in Oakland Coumty is essentially just people migrating from others parts of Metro Detroit [[mostly Detroit/Wayne County).

  6. #6

    Default

    Quote Originally Posted by 313WX View Post
    They were referring to the population of the region.

    The growth in Oakland Coumty is essentially just people migrating from others parts of Metro Detroit [[mostly Detroit/Wayne County).
    The state on Michigan is on pace to grow by 200k people this decade and likely surpassing 10M by 2020. Metro Detroit has grown by 40,000 in this decade.

  7. #7

    Default

    Quote Originally Posted by Luke09 View Post
    The state on Michigan is on pace to grow by 200k people this decade and likely surpassing 10M by 2020. Metro Detroit has grown by 40,000 in this decade.
    But Metro Detroit is still below its 2000 peak.

    And consider it's been stuck between 4.2 and 4.5 million since 1970 with only a less than 1% increase this decade, that's statistically stagnant growth.

  8. #8

    Default

    And the highway project is adding 25% more lanes!

  9. #9

    Default

    The proposed tunnel doesn't sound very large at all, and frankly isn't even touching the amount of crap overflowing in Lake St Clair.

    26.56 BILLION Gallons of Sanitary and Combined Sewage was discharged into our waterways in 2017.
    https://www.michigan.gov/documents/d...t_641875_7.pdf

    Think bigger folks:
    https://www.scientificamerican.com/a...waukee-tunnel/
    http://www.encyclopedia.chicagohisto...pages/367.html

  10. #10

    Default

    Quote Originally Posted by hybridy View Post
    The proposed tunnel doesn't sound very large at all, and frankly isn't even touching the amount of crap overflowing in Lake St Clair.
    This will be in addition to the enormous holding tank at Red Run, which is basically the size of a buried airplane hangar.

    Ever see a TBM? The small ones are the size of a school bus. Even assuming it's a *very* small machine [[I think the smallest you can get is ~7') at 6 miles long it should hold around 36 million gallons of water. At 14' diameter, it would double the holding capacity of the existing Red Run tank [[I think it's around 125 million gallons.)

  11. #11

    Default

    Quote Originally Posted by JBMcB View Post
    This will be in addition to the enormous holding tank at Red Run, which is basically the size of a buried airplane hangar.

    Ever see a TBM? The small ones are the size of a school bus. Even assuming it's a *very* small machine [[I think the smallest you can get is ~7') at 6 miles long it should hold around 36 million gallons of water. At 14' diameter, it would double the holding capacity of the existing Red Run tank [[I think it's around 125 million gallons.)
    Yeah, I stand by my statement. The MMSD Deep Tunnel in MKE is 36 MILES long and can store 521 Billion gallons. Metro Detroit storage/holding for combine storm/sewer stands at 160 Million gallons. source

  12. #12

    Default

    Quote Originally Posted by hybridy View Post
    Yeah, I stand by my statement. The MMSD Deep Tunnel in MKE is 36 MILES long and can store 521 Billion gallons. Metro Detroit storage/holding for combine storm/sewer stands at 160 Million gallons. source
    That's 521 million. It is still a lot. If they use a larger TBM, they could get close to that capacity, combined with the existing red run tank.

  13. #13

    Default

    Quote Originally Posted by JBMcB View Post
    That's 521 million. It is still a lot. If they use a larger TBM, they could get close to that capacity, combined with the existing red run tank.
    yes, my bad.

  14. #14

    Default

    I'm not clear on this, but the current Red Run tank is for COMBINED waste. I believe the M-DOT tunnel will be storm water only. If my thinking is right, the storm water could be pumped directly into the Red Run without treatment.

    I'll try to get clarity on this if I interact with the M-DOT again.

  15. #15

    Default

    Sadly, this project will only exacerbate the sprawl.

    Whatever it's cost, it's compounded many times over by every person it facilitates moving further North.

    Meanwhile, what a mess.

    First time back in Detroit for a long while, and I was driving up to Troy. Wanted Big Beaver West, saw a sign only for Big Beaver East, passed the exit expecting another, and had to drive all the way up to Square Lake due to the mistake.

    Bad signage MDOT!
    Last edited by bust; July-19-19 at 03:10 PM.

  16. #16

    Default

    Quote Originally Posted by 48307 View Post
    I'm not clear on this, but the current Red Run tank is for COMBINED waste. I believe the M-DOT tunnel will be storm water only. If my thinking is right, the storm water could be pumped directly into the Red Run without treatment.

    I'll try to get clarity on this if I interact with the M-DOT again.
    This is correct.

    Back in the late 1800s before automobiles were big and we developed the road network [[and huge amounts of paved surfaces) we have today, the standard was to combine both storm and septic sewers together into one system.

    By the mid to end of the 20th century, it was realized this was a bad idea and that the two systems should be separate... but that separation would take a ton of money and effort to build. And given how much our society invests in infrastructure, it is 2019 and many of the systems are still combined.

    One advantage of large ticket items like the I-75 project, is that it finally provides an opportunity to fund the separation of the two systems in the project limits. So this will be essentially be a giant tank of storm water constructed [[with obviously no septic) that can store water collected during major storms, and then release said water when things are a bit dryer.

    So regardless of what you may think of the I-75 expansion, this storm sewer expansion and separation should be a welcome addition by pretty much everyone.

  17. #17

    Default

    Sure is costly to get the infrastructure together when the ginormous sprawl of the Detroit metropolitan region has stretched it so thin.

    Imagine how much easier it would be to serve everyone if Detroit were again a city of nearly 2 million, and the inhabitants of distant suburbs and exurbs were 1.4 million fewer.
    Last edited by bust; July-19-19 at 02:46 PM.

  18. #18

    Default

    They could alleviate a lot of the traffic there for very little money. Re -sign I-75 out of Toledo up US 23 for through traffic North/South. Make what is now I-75 into the metro area a 3 digit spur/business route.

  19. #19

    Default

    Quote Originally Posted by Meddle View Post
    They could alleviate a lot of the traffic there for very little money. Re -sign I-75 out of Toledo up US 23 for through traffic North/South. Make what is now I-75 into the metro area a 3 digit spur/business route.
    Re-signing would do nothing. Everyone is already using a navigation device or application and it always chooses the shortest route based on time. If you change the names of the roads the software will still route you on the same roads.

  20. #20

    Default

    Quote Originally Posted by 48307 View Post
    Re-signing would do nothing. Everyone is already using a navigation device or application and it always chooses the shortest route based on time. If you change the names of the roads the software will still route you on the same roads.
    Not really sure why people are getting confused by the detours. Google Maps has all closures and constructions areas reflected on their app. I have been navigating / avoiding the construction perfectly fine using Google Maps. Oftentimes the app will find a better detour than the MDOT posted detour because the surface streets are getting pretty busy around rush hour.

  21. #21

    Default

    Quote Originally Posted by Meddle View Post
    They could alleviate a lot of the traffic there for very little money. Re -sign I-75 out of Toledo up US 23 for through traffic North/South. Make what is now I-75 into the metro area a 3 digit spur/business route.
    Why would anyone stay on 75 if you were going to Flint or North?

  22. #22

    Default

    Quote Originally Posted by Meddle View Post
    They could alleviate a lot of the traffic there for very little money. Re -sign I-75 out of Toledo up US 23 for through traffic North/South. Make what is now I-75 into the metro area a 3 digit spur/business route.
    Couple problems with that - I believe US 23 isn't entirely up to interstate guidelines, and when it does get upgraded to interstate guidelines, it's going to be part of I-73 [[if that's still alive).

  23. #23

    Default

    Quote Originally Posted by Meddle View Post
    They could alleviate a lot of the traffic there for very little money. Re -sign I-75 out of Toledo up US 23 for through traffic North/South. Make what is now I-75 into the metro area a 3 digit spur/business route.
    Part of 223/127 is supposed to become I-73. So there would be no need to change 75's route or designation. Most people will just take that when its finished anyways.

    [[https://en.wikipedia.org/wiki/Interstate_73)

    From 1999 MI is saying no to 73, but since its a federal highway approved by congress, it will happen regardless. Just time. In the mean time MDOT reinvested into upgrades and safety improvements.

    "Ohio and Michigan both abandoned further environmental studies on their portions of I-73 in 99'. It is important to note that most of the I-73 corridor in both of these states follows existing freeways or highways scheduled to be upgraded to freeways under plans that predate I-73."

    Now what we really need to see is 275 finished to 75, but with the addition of Martin Parkway, its most likely never happening now.

    Another highway I'd like to see finished is Davison. Just connect the damn thing to 96. From there idk, I just know it will take a lot of unneeded traffic out of downtown for people trying to get to the east side.

    edit:

    As recent as 2010:
    "Alan Clemmons announced that Interstate 75 had been adopted into the association. Clemmons said since I-75 lies within the I-73/74 corridor, and given its excitement in Michigan and Ohio, its inclusion into the I-73/74 Association is a "perfect fit" and helps reenergize allies in those states."

    And as recent as 2017:
    US Army Corps of Engineer issues permit to begin Construction of I-73

    Name:  I73Map.jpg
Views: 314
Size:  218.5 KB
    Last edited by scarecrow; July-30-19 at 09:14 AM.

  24. #24

    Default

    FOR IMMEDIATE RELEASE WEDNESDAY, AUGUST 7, 2019



    Reminder: Segment 3 of the I-75 modernization project inOakland County begins Sunday, Aug. 11
    Fast facts:
    - Segment 3 involves rebuilding more than 5 miles of I-75 between 8 Mile and 13 Mile roads.
    - In 2019, prep work will require continuous lane and ramp closures with two lanes open in each direction during peak travel times.
    - Prep work is expected to wrap up in November, allowing all lanes and ramps to remain open during the winter months.
    August 7, 2019 -- Weather permitting, work on segment 3 of the I-75 modernization project in Oakland County will begin on Sunday, Aug. 11. Initially, the construction impacts will begin on the southbound lanes from 11 Mile to 8 Mile roads as crews begin preparations for a multi-year project to rebuild more than 5 miles of pavement, replace 22 bridges, construct retaining walls, and install new drainage infrastructure.

    Starting at 3 p.m. Aug. 11, the right lane of southbound I-75 will be closed from 13 Mile to 8 Mile roads in order for crews to widen the shoulder for an eventual traffic shift. In addition to the single-lane closure, crews will close the following ramps:
    - Westbound I-696 ramp to southbound I-75,
    - Southbound I-75 exit to 8 Mile Road,
    - Southbound I-75 exit to 9 Mile Road,
    - 9 Mile Road entrance ramp to southbound I-75.

    Other 2019 work includes the construction of temporary median crossovers, the removal of the Dallas Road overpass above I-75, and work on the northbound service drive.

    In 2020, all I-75 traffic will be on the southbound side of the freeway between 11 Mile and 8 Mile roads with two lanes open in each direction separated by a temporary concrete barrier. This will allow for the rebuilding of the northbound lanes from 8 Mile Road to I-696, along with all northbound ramps, retaining walls and portions of the northbound service drive.

  25. #25

    Default

    This is going to cause havoc.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Instagram
BEST ONLINE FORUM FOR
DETROIT-BASED DISCUSSION
DetroitYES Awarded BEST OF DETROIT 2015 - Detroit MetroTimes - Best Online Forum for Detroit-based Discussion 2015

ENJOY DETROITYES?


AND HAVE ADS REMOVED DETAILS »





Welcome to DetroitYES! Kindly Consider Turning Off Your Ad BlockingX
DetroitYES! is a free service that relies on revenue from ad display [regrettably] and donations. We notice that you are using an ad-blocking program that prevents us from earning revenue during your visit.
Ads are REMOVED for Members who donate to DetroitYES! [You must be logged in for ads to disappear]
DONATE HERE »
And have Ads removed.