15 years ago [[ish) The building originally known as the Compuware Headquarters, now One Campus Martius was declared complete. However the building is actually short of its original design. As Bedrock Detroit had announced the building is getting an addition which is really more of a completion.

According to the the buzz around downtown, when One Campus Martius was built the then owner had made a decision that they would not need all the space that the origin so the building which was originally intended to be a diamond shape, instead became a big W.

[[See https://youtu.be/r97Nv8N7-mI)

Though it has been some time since Bedrock Announced their intention, construction has begun during the summer, but now things are looking up. Literally.

Name:  quandongcrane.jpg
Views: 6980
Size:  186.2 KB

The finished product is expected to look like this excess except for the over 900 foot tower that will be in front of it.



What's not known at this time is what will be the fate of the artwork currently on the back of the building.