  1. #626

    Default

    Quote Originally Posted by hybridy View Post

    interesting. speaks a lot to 1001 woodward. a reinterpreted twin!
    I guess I'm not a Dan Gilbert new building fan. This is as hideous as the new plan. I still think residential should go at the corners of Cadillac Square, Woodward, and Monroe. The National Theatre/food hall could be the lower part of a residential tower that extends from Cadillac Tower, along Monroe, and all the way around to Farmer Street. A multi-story attached garage would go in the middle/back, accessed from Farmer. Put the people at the center of Campus Martius, not way in the back along Monroe and Randolph.
    Last edited by royce; March-08-23 at 08:33 AM.

  2. #627

    Default

    Quote Originally Posted by royce View Post
    I guess I'm not a Dan Gilbert new building fan. This is as hideous as the new plan.
    Why are you commenting on a post from 2016? This rendering is WAY out of date and was never officially proposed.
    Last edited by hybridy; March-08-23 at 10:20 AM.

  3. #628

    Default

    Quote Originally Posted by hybridy View Post
    Why are you commenting on a post from 2016? This rendering is WAY out of date and was never officially proposed.
    They just came out with a new rendering and details about the phasing. So, there had to be an official rendering before this. I thought this was it.

    BTW, what's up with the phasing description. If you have a Phase One, then the next step is Phase Two. If you have a Phase A, then the next step is Phase B. How is it that Gilbert and company are saying Phase A1 and Phase A2 and then a Phase B? Just seems like there shouldn't be a Phase A2 if you have a Phase B. So this new Monroe Block development should go from Phases 1,2, and 3 or Phases A, B, and C.

  4. #629

    Default

    My guess would be that Phases A1 and A2 will start at the same time, but will finish at different times.

  5. #630

    Default

    Quote Originally Posted by royce View Post
    They just came out with a new rendering and details about the phasing. So, there had to be an official rendering before this. I thought this was it.

    BTW, what's up with the phasing description. If you have a Phase One, then the next step is Phase Two. If you have a Phase A, then the next step is Phase B. How is it that Gilbert and company are saying Phase A1 and Phase A2 and then a Phase B? Just seems like there shouldn't be a Phase A2 if you have a Phase B. So this new Monroe Block development should go from Phases 1,2, and 3 or Phases A, B, and C.
    They are subsets of the base phase.

    For instance -Phase 1A would be the design of the 1st Phase then it gets broken down from there 1B the implementation of the project,what it’s going to take to hire the workforce,break ground,get everything in place Phase 2 which would be actually starting the work or breaking ground.
    Phase 2A digging the dirt out etc.

    Its an organization chart for complex projects that breaks down each step of each phase.

    It helps keep projects on track with deadlines,while one crew is dealing with Phase 2B another is dealing with Phase 2C so you do not lose forward momentum.

    Its more critical now with supply shortages,you do not want to have a crew sitting around on payroll waiting for anything.

    Looks like the way they are structuring it is to complete within a specific time frame and try and remove the costly delay aspect.

    Anything construction related,time is money,the more things drag out the more expensive it gets,most construction loans are progress based.

    You get X amount of money as you complete each phase or each subset of each phase,the bank sends their people out to check it out and if it is okay,they cut the check for the next phase.

    There is a lot of money in each phase that has to be paid out,normally contractors and suppliers.

    You saw the flip side of that with the recent lawsuit by the architect against a developer for non payment,structured loans keeps people paid.

    In the late 80s Du Pont built a massive development in downtown Orlando,probably twice the size of this.

    Thousands of contractors never got paid,many killed themselves,Du Pont just claimed bankruptcy and everybody got screwed,millions and millions.

    Structured like this one,contractors and suppliers are more comfortable working with the developers because they know they will get paid,sometimes if a project gets screwy the bank will take it over and complete it.

    Even if you are the bank,you still have to follow the rules,you cannot just reach in the till and pull out money for a project,even Mr Gilbert has to follow the procedures,probably saves a lot of pain when bending over to pick up the soap if you get caught.
    Last edited by Richard; March-09-23 at 09:39 PM.

  6. #631

    Default

    Last edited by Danny; March-10-23 at 10:54 AM.

Page 26 of 26 FirstFirst ... 16 21 22 23 24 25 26

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Instagram
BEST ONLINE FORUM FOR
DETROIT-BASED DISCUSSION
DetroitYES Awarded BEST OF DETROIT 2015 - Detroit MetroTimes - Best Online Forum for Detroit-based Discussion 2015

ENJOY DETROITYES?


AND HAVE ADS REMOVED DETAILS »





Welcome to DetroitYES! Kindly Consider Turning Off Your Ad BlockingX
DetroitYES! is a free service that relies on revenue from ad display [regrettably] and donations. We notice that you are using an ad-blocking program that prevents us from earning revenue during your visit.
Ads are REMOVED for Members who donate to DetroitYES! [You must be logged in for ads to disappear]
DONATE HERE »
And have Ads removed.