AMTRAK unfortunately operates at a loss. Except for the NE corridor, AMTRAK operates over freight tracks. If they keep their schedule, AMTRAK trains get priority by the dispatcher. If they fall behind schedule because of a station delay [[loading a wheel chair, slow loading of baggage) then they are the dispatcher's "red headed step child" and every single freight train takes priority over them.