Quote Originally Posted by stasu1213 View Post
These apartments are opening in a couple of months after only a few months of being built while DuCharme in Lafayette Park is still being constructed after 2 years of construction. What's wrong with this picture

This building was erected using a lot of pre-fab materials. It wasn't a traditional steel and beam structure with stone or materials overlaying it. All those pieces were pre-fab concrete raised into position so I'm sure that cut down on construction time. Also bedrock seems much more efficient and has more funds than other developers I'm sure