Quote Originally Posted by 48091 View Post
We need to get the I-75 corridor project rolling that will add a fourth [[planned HOV) lane between 8 Mile and M-59.

Possible things that could happen there:

- Redo of Square Lake Exit\entrance so that exits and entrances are made on the RIGHT side, and not the left side
- 12 Mile SPUI [[Single Point Urban Interchange)
- 14 Mile exit offshoot directly to Concord
- Braiding of WB I-696 to I-75 ramp to give direct exit to I-75 service drive @ 11 Mile from ramp, instead of offering as part of merge\weave
- Widening of many bridges in Madison Heights\Royal Oak\Troy
- Demolition of Dallas bridge just south of Lincoln

Uh no. Politicians have been pushing for this for a long time. During that time I have spent a lot of time on 75 during rush hour and there is absolutely no need for expansion. With the exception of a brief delay at 696 and 14 mile there is no back up or slow down in traffic.

This would be an absolute waste of money.