Belanger Park River Rouge
ON THIS DATE IN DETROIT HISTORY - BELANGER PARK »



Page 1 of 2 1 2 LastLast
Results 1 to 25 of 37
  1. #1

    Default Proposed 16-story mixed-use building at Gratiot and Brush

    This one somehow flew under the radar and just popped up as a brownfield application on the DEGC Facebook Page.

    Here is the full link to the brownfield application.

    Facebook Post

    A few screencaps from the application.

    Name:  Capture2.jpg
Views: 4857
Size:  65.3 KB

    Name:  Capture3.jpg
Views: 2526
Size:  69.7 KB
    Last edited by JonWylie; June-11-20 at 09:43 AM.

  2. #2

    Default

    Here's hoping.... it's an empty parking block right now... nothing would be razed, and density would be increased....

    https://www.google.com/maps/@42.3357...7i16384!8i8192

  3. #3

    Default

    oooh! This is great!

    There's gonna be some serious development in that area with the University of Michigan campus.

  4. #4

    Default

    It's nice to see a new rendering of something in Detroit. I missed that feeling!

  5. #5

    Default

    Quote Originally Posted by EGrant View Post
    It's nice to see a new rendering of something in Detroit. I missed that feeling!
    Not a fan of the architecture, as I believe it will age rather poorly. But do like the location and density.

  6. #6

    Default

    Quote Originally Posted by Atticus View Post
    Not a fan of the architecture, as I believe it will age rather poorly. But do like the location and density.
    In fairness I think most modern architecture being built today will not age well. Aesthetically atleast. If only we could bring back the days of Louis Sullivan

  7. #7

    Default

    I would be interested to know if the timeline has been pushed back at all. I noticed in that brownfield application that they were targeting a Summer 2020 start of construction with finishing it up in 2021.

  8. #8

    Default

    Quote Originally Posted by ILKSGAMI View Post
    I would be interested to know if the timeline has been pushed back at all. I noticed in that brownfield application that they were targeting a Summer 2020 start of construction with finishing it up in 2021.
    It looks like it will be using Barton Malow's "LIFTBuild" company, which appears to be some kind of modular form of fast construction.
    Last edited by EGrant; June-11-20 at 12:56 PM.

  9. #9

    Default

    I really hope this succeeds. This is EXACTLY the type of development that Detroit needs: mid-rise infill on an open parking lot. As much as I love impressive, tall skyscrapers that help define a unique skyline, I would rather see 10 of these than one Hudson Tower.

    When we start to see regular developments like this filling in all the empty space, only then will we know Detroit's real estate has turned a corner and is starting to be financially self-sustaining.

  10. #10

    Default

    There is a 13 story building that just skyrocketed up in Grand Rapids with a similar build technique. Assemble large slabs off site and then put together like legos. Hopefully this project does something along the same lines.

    https://www.urbanplanet.org/forums/t...e/40/#comments

  11. #11

    Default

    Looks great. I’m glad there’s no demolition necessary and it gets rid of a surface lot. It looks like the old pawn shop on Gratiot and Randolph that’s currently vacant will be renovated as part of this project too. One less parking lot, one less empty building, a decent design and more infill downtown sounds good to me.

  12. #12

    Default

    The building looks really nice and a big step for Greektown!! I'm crossing my fingers this project doesn't put on hold/stall. Downtown needs more buildings to full up these parking lots and we got too many of them, also I don't mind more new parking decks.

  13. #13

    Default

    After COVID-19 that building will come true. Let's look are buyers.

  14. #14

    Default

    I wouldn't worry about the design too much yet. It'll probably change before the final rendition actually starts being constructed.

  15. #15

    Default

    Quote Originally Posted by mikeg19 View Post
    I wouldn't worry about the design too much yet. It'll probably change before the final rendition actually starts being constructed.
    You're right, but never for the better. We refer to it as 'Value Engineering'. What you're seeing in the application is what the developers want to spend. Once this thing gets hard bid, materials, details and finishes will be curtailed. The one exception would be a dead construction market, then the trades fight over jobs and bids become more competitive.

  16. #16

    Default

    There was a point about a year or so ago where it felt like there was a new development project announced every week and I was more likely to worry about the long-term architectural significance of every single render, but in today's climate I'd just be happy to see an empty lot transformed. Especially in an area with almost no residential buildings.

  17. #17

    Default

    I feel like we still get a steady stream of announcements. That Godfrey hotel was just announced a month or so ago.

  18. #18

    Default

    Quote Originally Posted by Satiricalivory View Post
    I feel like we still get a steady stream of announcements. That Godfrey hotel was just announced a month or so ago.
    I guess March was kinda sorta a month ago, yeah.

  19. #19

    Default

    Hey! We're all losing track of time after corona.

  20. #20

    Default

    Quote Originally Posted by Satiricalivory View Post
    Hey! We're all losing track of time after corona.
    Very true!

  21. #21

    Default

    This project is back in the news. The brownfield plan was approved and the city council approved Neighborhood Enterprise Zone tax abatement. The developer is talking about starting construction before the end of the year. I am cautiously optimistic about this project. It looks like Barton Malow wants to showcase the liftbuild construction style.
    https://www.liftbuild.com/projects/exchange/
    https://eu.freep.com/story/money/bus...ng/5863733002/

  22. #22

    Default

    Well, whenever it starts, it will rise quickly using that technique

  23. #23

    Default

    The tight timeline is promising, we just need about 10 more buildings about this size going up within the next few years to keep up the momentum.

    Infill will keep Detroit progressing more than halo projects.

  24. #24

    Default

    Pleasantly surprised to see updates on this. And “cautiously” optimistic.

    There is still way way too much infill needed. Due to the unique construction I’d love to follow this going up.

  25. #25
    Join Date
    Sep 2009
    Posts
    4,786

    Default

    For comparison the building that once stood on that corner.

    Designed by Albert Kahn, Ernest Wilby Associate for the Dodge Brothers. Owen & Company Furniture Building, 350 Gratiot built in 1909 Downtown, Detroit, MI. Includes an article featuring the building from a 1909 edition of the Detroit Free Press.

    Image from a brochure for Bryant-Detwlier Construction Company, circa 1921.
    Demolished: date unknown to me.
    Attached Images Attached Images    

Page 1 of 2 1 2 LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Instagram
BEST ONLINE FORUM FOR
DETROIT-BASED DISCUSSION
DetroitYES Awarded BEST OF DETROIT 2015 - Detroit MetroTimes - Best Online Forum for Detroit-based Discussion 2015

ENJOY DETROITYES?


AND HAVE ADS REMOVED DETAILS »





Welcome to DetroitYES! Kindly Consider Turning Off Your Ad BlockingX
DetroitYES! is a free service that relies on revenue from ad display [regrettably] and donations. We notice that you are using an ad-blocking program that prevents us from earning revenue during your visit.
Ads are REMOVED for Members who donate to DetroitYES! [You must be logged in for ads to disappear]
DONATE HERE »
And have Ads removed.