Belanger Park River Rouge
ON THIS DATE IN DETROIT HISTORY - BELANGER PARK »



Results 1 to 10 of 10
  1. #1

    Default Any News on the Book Tower's future?

    The title kinda says it all. Does anyone know what Dan Gilbert plans to do with his downtown tower since he purchased it?

  2. #2

    Default

    They are working on the exterior and have been for awhile now. Cleaning it and rehabbing some of the architectural detail. There has not been any official announcement on what exactly will go into it besides the standard "office/retail/living space" boilerplate.

  3. #3

    Default

    Rumor is the exterior fire escape has to remain with the remodel, as there is only one interior staircase. Obviously the escape structure will need to be rehabbed, but it is an interesting exterior "decoration".

  4. #4

    Default

    I've heard from sources that that everything below the tower will be commercial and the tower itself all residential. I don't think anything is set in [[lime) stone though so however true this is currently, they could so something totally different.

  5. #5

    Default

    Did someone say "rickety fire escape"?
    Attached Images Attached Images  

  6. #6

    Default

    Quote Originally Posted by Atticus View Post
    Rumor is the exterior fire escape has to remain with the remodel, as there is only one interior staircase. Obviously the escape structure will need to be rehabbed, but it is an interesting exterior "decoration".
    I would have assumed it needed to remain. You wouldn't want a disaster from fire like that London tower block just experienced. I wonder if Dan has a plan to jazz it up though. Maybe turn it into a huge translucent slide to the bottom.....

  7. #7

    Default

    I was eyeing the fire escape yesterday, wondering how the contractors will erect scaffolding enough to clean that side of the building, since the escape blocks their general ability to do so. Anyone know how this can/will be done?

    1953

  8. #8

    Default

    According to Bedrock, and I apologize, I can't seem to locate the link [[perhaps it was on their Twitter feed), the plan is to remove the fire escape, clean the side, and rebuild the fire escape. As far as whether the f.e. will be completely new or not, I don't know, but there are certainly large sections that are not salvageable.

  9. #9

    Default

    The outdoor and indoor fire escape stairs are only about 2-3 ft. apart.... the width of the exterior wall that separates them.

  10. #10

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Instagram
BEST ONLINE FORUM FOR
DETROIT-BASED DISCUSSION
DetroitYES Awarded BEST OF DETROIT 2015 - Detroit MetroTimes - Best Online Forum for Detroit-based Discussion 2015

ENJOY DETROITYES?


AND HAVE ADS REMOVED DETAILS »





Welcome to DetroitYES! Kindly Consider Turning Off Your Ad BlockingX
DetroitYES! is a free service that relies on revenue from ad display [regrettably] and donations. We notice that you are using an ad-blocking program that prevents us from earning revenue during your visit.
Ads are REMOVED for Members who donate to DetroitYES! [You must be logged in for ads to disappear]
DONATE HERE »
And have Ads removed.