  1. #226

    Default

    You all are most welcome!

    I've slowed down the picture cadence to about one per month for this site. I still like to have occasional pictures just so we can see how the project is moving. My most recent picture and the previous one have almost no difference.

  2. #227
    Join Date
    Apr 2018
    Posts
    54

    Default

    We'll be posing updates from on the ground and from above as real construction gets going on Instagram, Facebook, Minds, and more in coming weeks and months. It should be fun.

  3. #228

    Default

    Who is this "we" you're speaking of? Are you with Bedrock or one of the construction companies/general contractor?

  4. #229

    Default

    Anything new as of yet? Haven't been down to check on the site myself in about a month or so.

  5. #230
    Join Date
    Aug 2018
    Posts
    320

    Default

    I was there during opening day, equipment is on site but nothing was moving.

  6. #231

    Default

    This is just a guess, but I think we will see work begin once the demo work is complete over at the Hudson site. While Hudson is clearly under construction, there is also quite a bit of demo still going on too, and once finished I think that same crew will move over to this site to demo that parking lot. I have no info, it's a guess

  7. #232

    Default

    Quote Originally Posted by Luke09 View Post
    This is just a guess, but I think we will see work begin once the demo work is complete over at the Hudson site. While Hudson is clearly under construction, there is also quite a bit of demo still going on too, and once finished I think that same crew will move over to this site to demo that parking lot. I have no info, it's a guess
    Demolition has been completed at the Hudson site since last fall and they've been working on the foundation since that time. And there really isn't a reason both sites can't be worked on at the same time. Monroe blocks will start demo and construction soon enough. Patience, people.

  8. #233

    Default

    Quote Originally Posted by NSortzi View Post
    Demolition has been completed at the Hudson site since last fall and they've been working on the foundation since that time. And there really isn't a reason both sites can't be worked on at the same time. Monroe blocks will start demo and construction soon enough. Patience, people.
    Concrete demolition is stilling going on at the Hudson site, they're working in tandem with the caisson construction crew.

    https://www.youtube.com/channel/UC-h...s1ZawzA/videos

  9. #234

    Default

    Quote Originally Posted by Nicholas D'Asti View Post
    Anything new as of yet? Haven't been down to check on the site myself in about a month or so.
    They're working but not on anything major. They've removed a streetlight and a parking meter. They've been setting up the temporary construction offices, relocating utilities, etc.

  10. #235

    Default

    Quote Originally Posted by Luke09 View Post
    Concrete demolition is stilling going on at the Hudson site, they're working in tandem with the caisson construction crew.

    https://www.youtube.com/channel/UC-h...s1ZawzA/videos
    If you’re referring to the pile of rubble on the south end of the site, that’s the remains of the first ramp into the site that partially contained debris from the garage. No actual demolition has occurred in months.

  11. #236

    Default

    ^They are still removing the concrete [[and rebar) floor in various sections around the site. That would technically be demolition, as they are chopping up, separating and removing the rubble.

  12. #237

    Default

    Some steel was dropped off at the site last Thursday along farmer between phase 2 and 1 portions of the site and Workman were attaching more bedrock/turner construction signs to the fencing in the phase 2 section of the development today.

    Name:  C85687E0-B0D4-47FD-8755-2C03FB05B096.jpg
Views: 1991
Size:  109.9 KB
    Name:  46ACF117-872F-4A0A-8E7F-3A59FA11A635.jpg
Views: 2004
Size:  170.8 KB
    Name:  48DB7C25-F2D0-4F63-ADCE-1A273FC5E839.jpg
Views: 1972
Size:  92.1 KB

  13. #238

    Default

    That might be temporary storage of materials for the One Campus Martius expansion. They put up more windows on that building on Friday than the new Pizza HQ got in the last 9 months.

  14. #239

    Default

    Quote Originally Posted by 48307 View Post
    That might be temporary storage of materials for the One Campus Martius expansion. They put up more windows on that building on Friday than the new Pizza HQ got in the last 9 months.
    Could also be for the Hudson’s site tower. Construction on the tower is supposed to begin soon.

  15. #240

    Default

    Seems unlikely to be for One Campus Martius as the structure is supposed to be topped out. It could be for the Hudson's site, but I can't imagine what beams of such short length would be used for on site right now.

  16. #241

    Default

    Quote Originally Posted by Dexlin View Post
    Seems unlikely to be for One Campus Martius as the structure is supposed to be topped out. It could be for the Hudson's site, but I can't imagine what beams of such short length would be used for on site right now.
    Correct me if I am mistaken, but the Hudson Tower is being built by Barton Mallow, and the Monroe Block is being built by Turner Construction. If this is the case, I find it hard to believe that one contactor [[Turner) is allowing a rival company [[Barton) to store their steel on the site, even if both parcels are owned by Gilbert.

  17. #242

    Default

    I have no idea who the general contractor is for Monroe Blocks, but if that is the case, then, yes, that would be odd. So the steel is most likely for that project if Turner is building it.

  18. #243

    Default

    Could be braces for a wall or pieces for a crane

  19. #244

    Default

    Any signs of activity on the site?

  20. #245

    Default

    Quote Originally Posted by Nicholas D'Asti View Post
    Any signs of activity on the site?
    There is activity but I think it's all related to the One Campus Martius addition.

    They've got construction trailers and a fuel tank on site but no actual generator to power things.

  21. #246

    Default

    While, they have less than three weeks of spring left to start the substantial excavation or we’ll be able to officially say they’re behind schedule according to the released timeline, But if the weather in the summer cooperates maybe they can catch up.

  22. #247

    Default

    Quote Originally Posted by DetroitRises View Post
    While, they have less than three weeks of spring left to start the substantial excavation or we’ll be able to officially say they’re behind schedule according to the released timeline, But if the weather in the summer cooperates maybe they can catch up.
    Skippers Rule?

  23. #248

    Default

    Presuming that Gilbert hasn’t signed significant tenants for the office tower, it would be foolish to build the tower on spec. Perhaps the groundbreaking and renders were more for marketing the property. Also the ground breaking was likely just to snag tax benefits and perhaps there is enough tile built into construction schedule/benefit kick back to get some tenants to commit.

  24. #249
    Join Date
    Aug 2018
    Posts
    320

    Default

    not really, much bigger office towers in Chicago were built entirely on spec and im pretty sure Detroit has lower vacancy rates.

  25. #250

    Default

    https://www.crainsdetroit.com/real-e...blocks-project

    Props to Bedrock for being *somewhat* transparent on this. I think they are telling the truth. With OCM, Hudsons, and the Monroe block, there is really no place to stage stuff anywhere. They are using the Monroe block site to stage stuff for OCM. There is no room at the Hudson's site to stage anything.

Page 10 of 26 FirstFirst ... 5 6 7 8 9 10 11 12 13 14 15 20 ... LastLast

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Instagram
BEST ONLINE FORUM FOR
DETROIT-BASED DISCUSSION
DetroitYES Awarded BEST OF DETROIT 2015 - Detroit MetroTimes - Best Online Forum for Detroit-based Discussion 2015

ENJOY DETROITYES?


AND HAVE ADS REMOVED DETAILS »





Welcome to DetroitYES! Kindly Consider Turning Off Your Ad BlockingX
DetroitYES! is a free service that relies on revenue from ad display [regrettably] and donations. We notice that you are using an ad-blocking program that prevents us from earning revenue during your visit.
Ads are REMOVED for Members who donate to DetroitYES! [You must be logged in for ads to disappear]
DONATE HERE »
And have Ads removed.