I highly doubt that the hotel will end up the same height as the apartments, despite them both being 25 stories. Based on the renderings, as well as the fact that the first 5 floors will be used for...
Type: Posts; User: JK313
I highly doubt that the hotel will end up the same height as the apartments, despite them both being 25 stories. Based on the renderings, as well as the fact that the first 5 floors will be used for...
https://detroitmi.gov/government/mayors-office/bridging-neighborhoods-program/property-listings/7650-e-jefferson-91422
Both the exchange and Huntington projects also took at least a year from announcement to groundbreaking.
https://www.freep.com/story/news/education/2021/07/14/ilitch-gilbert-detroit-center-innovation-project/7971987002/
Supposedly Ross has been talking with Chris Ilitch about building it on some of...
They said the peripheral structure for the block will take 9 months. Considering the size of the site, and the pace of construction up until now, this should go up relatively fast.
Yeah it’s supposed to open up this fall. Last I saw Olympia posted a photo of a unit on Twitter that looked nearly finished, so I’m assuming they must be on track surprisingly.
I believe it’s supposed to be finished this fall. Olympia’s Twitter had some photos showing the insides of rooms and it looked like they were getting pretty close to finished
Speaking of the UA building, it looks like they quietly got there way and the theater portion will be demolished after all. It’s ridiculous how preservation rules only seem to apply to some people in...
Uh since when was the office block ever going to be 20 stories? This is the first time I ever heard that so not sure where LeDuff got his info from. The tallest I ever heard was 14 stories and 240...
Yeah it looks like they did the whole lot. Makes me wonder if they’re planning on making the drive in semi-permanent, it wouldn’t make much sense to repave it otherwise.
Looks like they’ve been resurfacing the parking lot where the drive in theater was earlier this year. I’m guessing this isn’t going to happen any time soon, especially now with the effect that covid...
I haven’t seen any work on either of the 2 shells adjacent to the parking garages since before LCA opened back in 2017. Other than occasionally covering them with some plastic wrap/tarp that would...
Lol you obviously don’t follow Chicago high rise development. They get downsized all the time the only difference is it’s from a 1000+ ft super tall to a 800ft skyscraper.
https://www.crainsdetroit.com/voices-kirk-pinho/real-estate-insider-everything-has-price-tag-guess-how-many-zeroes-are-penobscots
Apparently the scumbag wants at least 100 million for it, so it’s...
The one is East Lansing is 22,000 sq. ft
Just block them, that’s what I did. If they stop getting the response they’re looking for they’ll eventually go away. It’s sad someone can be so miserable that they have nothing better to do than...
I don’t see the problem. Half a dozen historic buildings are potentially being saved/renovated. The people living there are going to have to park somewhere, and a couple small existing surface lots...
Would be nice to see, but I won’t hold my breath. The article also mentioned the United artists building renovation had already started. Was there ever a decision made regarding whether the theater...
It’s delayed until 2021 along with the AC hotel on Woodward
I wouldn’t imagine there will be much to share. Last I heard it was being put on hold until after covid. Although the start dates for construction had continuously come and gone even before covid
They were working Saturdays, and occasionally sundays up until recently. Not sure what changed though. Also according to someone who contacted the leasing agent for the mid, it’s currently on hold at...
Not true. You can see where they’ve uncovered more caissons to the right of the “pit” on the tower side. They’ve also poured some more columns along the wall out of view of the camera. They do seem...
Bedrock stated their reason for getting the variances approved now was so they can be ready to break ground as soon as they have a tenant signed. This project definitely isn’t canceled/dead, but it...
So was the fate of the theater portion ever officially decided? It appears that scaffolding is being installed on the building, so I’m assuming the renovation is about to get underway.
I just assumed they were switching out drilling bits. I’ve seen them load up trucks with similar pieces of equipment a couple times before, only to have more delivered the next couple days
|