Yesterday [[2/3), trucks arrived to begin hauling away the largest caisson drilling equipment. The massive caissons for the tower are likely complete, though they're still sinking more for the block. The smaller block bores appear to be taking longer due to obstructions [[likely old footings from Hudson's) - they're frequently changing the down hole tools to cut with one size, switch to another size, excavate, lather, rinse, repeat.