Michigan Central Restored and Opening
RESTORED MICHIGAN CENTRAL DEPOT OPENS »



Results 1 to 25 of 1395

Threaded View

  1. #11
    Join Date
    May 2009
    Posts
    3,501

    Default

    I want to change the subject to hopefully a more critical question:

    "IF Ilitch agrees [[or was 'forced') to keep both buildings does he need to have his architects, engineers, etc. re-do their work? "

    Wouldn't that require a MAJOR design change regarding the loading dock, parking deck, etc.?

    I assume that would take months and change the design concept. And, BTW, the loading dock isn't where it was last week. Now it opens into the visitor's lockerroom. Oops.

    It isn't simple like politicians who will get a word processor and insert the word, "Not" into a single sentence and say the problem has been resolved.
    Last edited by emu steve; April-21-15 at 05:55 AM.

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Instagram
BEST ONLINE FORUM FOR
DETROIT-BASED DISCUSSION
DetroitYES Awarded BEST OF DETROIT 2015 - Detroit MetroTimes - Best Online Forum for Detroit-based Discussion 2015

ENJOY DETROITYES?


AND HAVE ADS REMOVED DETAILS »





Welcome to DetroitYES! Kindly Consider Turning Off Your Ad BlockingX
DetroitYES! is a free service that relies on revenue from ad display [regrettably] and donations. We notice that you are using an ad-blocking program that prevents us from earning revenue during your visit.
Ads are REMOVED for Members who donate to DetroitYES! [You must be logged in for ads to disappear]
DONATE HERE »
And have Ads removed.