It would be cheaper have heavy-rail run along existing rail right-of-ways. There are tracks running along 94 already, and come very close to the airport. I would like to see it run on overhead electric lines or electrified third rail, and run very fast, like 50 mph at the slowest and connect directly to each terminal. New Center could be starting point, but I'd like to see it eventually move [[along with Amtrak) to a renovated Michigan Central Station, that would also connect to a Michigan Ave rapid transit line.
Bookmarks