Belanger Park River Rouge
NFL DRAFT THONGS DOWNTOWN DETROIT »



Page 2 of 2 FirstFirst 1 2
Results 26 to 26 of 26
  1. #26

    Default

    Finally, the Navy Pier Flyover project begins construction. The elevated bike path will reduce bicycle traffic jams and injuries from the current obsolete bike path bridge that's cantilevered from the side of US-41

    http://www.chicagotribune.com/news/l...4791127.column

    Final cost of the project is $60 million. It doesn't appear the project length has changed much. About 1/2 mile upgrade for the lakefront trail. Still will make a huge difference, especially for those who commute everyday and will enjoy increased capacity.


    In other news, construction on the Bloomingdale Line is in full force. Dangerous old rail bridges are being knocked out and replaced with modern spans
    https://www.facebook.com/The606Chicago
    Last edited by wolverine; March-18-14 at 11:51 PM.

Page 2 of 2 FirstFirst 1 2

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Instagram
BEST ONLINE FORUM FOR
DETROIT-BASED DISCUSSION
DetroitYES Awarded BEST OF DETROIT 2015 - Detroit MetroTimes - Best Online Forum for Detroit-based Discussion 2015

ENJOY DETROITYES?


AND HAVE ADS REMOVED DETAILS »





Welcome to DetroitYES! Kindly Consider Turning Off Your Ad BlockingX
DetroitYES! is a free service that relies on revenue from ad display [regrettably] and donations. We notice that you are using an ad-blocking program that prevents us from earning revenue during your visit.
Ads are REMOVED for Members who donate to DetroitYES! [You must be logged in for ads to disappear]
DONATE HERE »
And have Ads removed.