Michigan Central Restored and Opening
RESTORED MICHIGAN CENTRAL DEPOT OPENS »



Results 1 to 25 of 78

Threaded View

  1. #11

    Default

    Quote Originally Posted by stasu1213 View Post
    All of the work done to it, Bonstelle, and other projects saving the Hudson site probably are window dressing for the NFL draft. Work will slow to almost a standstill after the event is over.
    I partly disagree. I think that the Cadillac Square part of the Monroe Blocks... the venues with the National Theatre facade and the Food Hall on the corner at Campus Martius will be worked on starting next year. The rest of the 2 blocks will be empty, until whenever they build the office tower and residential buildings. I think Gilbert wants to tie Campus Martius together with Cadillac Square [and a rehabbed residential Cadillac Tower] and the Hudson Block.

    Whatever functions they used the one Monroe block for, such as movies, etc. They can move those functions to the other block, until the time when towers rise.
    Attached Images Attached Images  
    Last edited by Gistok; November-30-23 at 04:19 AM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Instagram
BEST ONLINE FORUM FOR
DETROIT-BASED DISCUSSION
DetroitYES Awarded BEST OF DETROIT 2015 - Detroit MetroTimes - Best Online Forum for Detroit-based Discussion 2015

ENJOY DETROITYES?


AND HAVE ADS REMOVED DETAILS »





Welcome to DetroitYES! Kindly Consider Turning Off Your Ad BlockingX
DetroitYES! is a free service that relies on revenue from ad display [regrettably] and donations. We notice that you are using an ad-blocking program that prevents us from earning revenue during your visit.
Ads are REMOVED for Members who donate to DetroitYES! [You must be logged in for ads to disappear]
DONATE HERE »
And have Ads removed.