    Quote Originally Posted by MikeM View Post
    To repair the damage done by the work completed so far. It was just a resurfacing that has been done, not at rebuild.

    Resurfacing of the 2 traffic lanes, in each direction, was done, and almost immediately they were ripped up to replace sewerage pipes. CoD replaced water mains on E. Jefferson about 10 years ago. They need replacing again? But this thread is about the reappearing sink hole at E. Jefferson and McClellan. Why would CoD go through a take out and repair, and not properly repair it in the first place? Job security? Where are the City Inspectors?

  2. #2

    Default

    Quote Originally Posted by Honky Tonk View Post
    Resurfacing of the 2 traffic lanes, in each direction, was done, and almost immediately they were ripped up to replace sewerage pipes. CoD replaced water mains on E. Jefferson about 10 years ago. They need replacing again? But this thread is about the reappearing sink hole at E. Jefferson and McClellan. Why would CoD go through a take out and repair, and not properly repair it in the first place? Job security? Where are the City Inspectors?
    Most projects in Detroit are probably loosed up or slowly done for job security of the head contractors. Sometimes you may see a street appearing to be completely done or a building. However, if there is still that one remains orange barrel left on the street or that one board covering that one corner window on the completed building that contractor is probably still getting money for the job is not technically completed

  3. #3

    Default

    Quote Originally Posted by stasu1213 View Post
    Most projects in Detroit are probably loosed up or slowly done for job security of the head contractors. Sometimes you may see a street appearing to be completely done or a building. However, if there is still that one remains orange barrel left on the street or that one board covering that one corner window on the completed building that contractor is probably still getting money for the job is not technically completed
    I think too many people confuse incompetence for conspiracy these days.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Instagram
BEST ONLINE FORUM FOR
DETROIT-BASED DISCUSSION
DetroitYES Awarded BEST OF DETROIT 2015 - Detroit MetroTimes - Best Online Forum for Detroit-based Discussion 2015

ENJOY DETROITYES?


AND HAVE ADS REMOVED DETAILS »





Welcome to DetroitYES! Kindly Consider Turning Off Your Ad BlockingX
DetroitYES! is a free service that relies on revenue from ad display [regrettably] and donations. We notice that you are using an ad-blocking program that prevents us from earning revenue during your visit.
Ads are REMOVED for Members who donate to DetroitYES! [You must be logged in for ads to disappear]
DONATE HERE »
And have Ads removed.