    Quote Originally Posted by bigboat View Post
    They have started to drill caissons they forgot about and are now catching up.
    They never 'forgot', if you watched the videos they never stopped drilling for the mid-rise portion, they still had some left. Your entire comment is misinformation.

  2. #1877

    Default

    For sure not much. Trying to pay down the balance!

    Quote Originally Posted by 401don View Post
    What's in your wallet?

    Nothing anymore.

  3. #1878

    Default

    Quote Originally Posted by Metro25 View Post
    They never 'forgot', if you watched the videos they never stopped drilling for the mid-rise portion, they still had some left. Your entire comment is misinformation.
    Yeah... gotta agree! This enormously complex project probably has so many checks and re-checks that it would make our head spin....

  4. #1879

    Default

    Quote Originally Posted by bigboat View Post
    They have started to drill caissons they forgot about and are now catching up. They are back to their old work style of having 4-6 construction workers in the pit. I'm still surprised that it is taking so long to get above street level, discounting the 2 month covid-19 shut down. I would estimate Bedrock has at least a $100 million invested to get to this point in construction. I'm sure that has to be some sort of construction loan involved also that has to have at least some sort of interest payment. Maybe Dan Gilbert is having 2nd thoughts about getting involved in such a large renewal project. The Detroit market will be even more depressed now with our covid-19 pandemic economic residuals.
    I am cautiously optimistic that for the first time in my lifetime, it won’t be Detroit [[metro area) that suffers significantly more RELATIVE to most other metro areas in the country. Obviously the COVID situation is still going to be an economic hit here and to most everyone, but the severity of it will hopefully not be significantly worse here compared to other large Metro areas.

    Much of that obviously depends on how our state and local leaders play their cards over the next few months, but again, for the first time in my lifetime it feels like Detroit was dealt a hand that wasn’t necessarily a loser. Hopefully it plays out that way.

  5. #1880

    Default

    Quote Originally Posted by Metro25 View Post
    They never 'forgot', if you watched the videos they never stopped drilling for the mid-rise portion, they still had some left. Your entire comment is misinformation.
    Basically, the gist of my comment was, I was kidding about the they forgot to drill some of the caissons. Sometimes there is a little too much seriousness on this site.

  6. #1881

    Default

    Your comment did not fly over my head, but I did not think it warranted a comment.

  7. #1882

    Default

    Ah yes, I forgot about the trolls who love to post nonsense about this project for giggles. It's just a joke! Haha! Moving dirt around! Etc.

    Feels good to have a little slice of pre-COVID internet in my life.

  8. #1883

    Default

    I am concerned. No progress on the tower side. On the block side, they are covering up the exposed rebar.

  9. #1884

    Default

    Quote Originally Posted by MrChrome View Post
    I am concerned. No progress on the tower side. On the block side, they are covering up the exposed rebar.
    https://www.youtube.com/watch?v=l9dAsBFvsyU

    what are you talking about? There's plenty of real work getting done on both tower and block literally from today.

  10. #1885

    Default

    Still working on the block side, but I haven’t noticed as much progress on the tower side since they resumed work. Seems like they’re using the area they cut out to store rebar for the caissons on the block side they’re still drilling. They have to be getting close to done with drilling though, right? First they said end of January, then end of March before they had to shut down.

  11. #1886

    Default

    Also thought I’d link this older article I stumbled across today. It provides some insight into the slow progress on the Monroe and Hudson sites as well as the financing aspect of some of Gilbert’s projects.

    https://www.google.com/amp/s/amp.fre...amp/2207973001

  12. #1887

    Default

    Crain's Detroit had a podcast last week with the head of Sachse, who mentioned that it will take 30-60 days for their projects to ramp up productivity. I'm not sure if they are working on this specific project, but it is probably applicable.

    https://podcasts.apple.com/us/podcas...=1000474571646

  13. #1888

    Default

    I think some of the reason why it looks like there is less activity than before is that it looks as though the rebar is being made offsite now which took up a lot of space with many bodies on it. I would assume this is for social distancing.

  14. #1889
    Join Date
    Sep 2019
    Posts
    322

    Default

    It looks like activity has ramped up today.

    https://www.youtube.com/watch?v=lPJZnQYT0Co

  15. #1890

    Default Hudsons Site

    They took away the drilling driveshaft, maybe for repair as they have been working on drilling a caisson hole for a couple of day's and had to stop many times. Maybe they encountered more chunks of the old Hudson's foundation again. I have read many perspectives on the delay of this project and the same with the Monroe Block development. It all comes down to market demand. Several other development projects downtown/midtown have either been scaled way back or much delay has slowed their completion. The demand for office and or apartments/condos is just not there in downtown Detroit, unfortunately. Many developers had hoped otherwise and it has not happened.
    If there was sufficient demand for high priced apartments and office space, the Monroe Block's and the Hudson development would be much further along. For one item of concern, they just cannot get financing without some sort of commitment from tenants.
    Last edited by bigboat; May-22-20 at 06:25 AM.

  16. #1891

    Default

    Quote Originally Posted by bigboat View Post
    They took away the drilling driveshaft, maybe for repair as they have been working on drilling a caisson hole for a couple of day's and had to stop many times. Maybe they encountered more chunks of the old Hudson's foundation again. I have read many perspectives on the delay of this project and the same with the Monroe Block development. It all comes down to market demand. Several other development projects downtown/midtown have either been scaled way back or much delay has slowed their completion. The demand for office and or apartments/condos is just not there in downtown Detroit, unfortunately. Many developers had hoped otherwise and it has not happened.
    If there was sufficient demand for high priced apartments and office space, the Monroe Block's and the Hudson development would be much further along. For one item of concern, they just cannot get financing without some sort of commitment from tenants.
    Do you have any actual knowledge or is this all just guessing?

  17. #1892

    Default

    Quote Originally Posted by bigboat View Post
    They took away the drilling driveshaft, maybe for repair as they have been working on drilling a caisson hole for a couple of day's and had to stop many times. Maybe they encountered more chunks of the old Hudson's foundation again. I have read many perspectives on the delay of this project and the same with the Monroe Block development. It all comes down to market demand. Several other development projects downtown/midtown have either been scaled way back or much delay has slowed their completion. The demand for office and or apartments/condos is just not there in downtown Detroit, unfortunately. Many developers had hoped otherwise and it has not happened.
    If there was sufficient demand for high priced apartments and office space, the Monroe Block's and the Hudson development would be much further along. For one item of concern, they just cannot get financing without some sort of commitment from tenants.
    This is almost entirely incorrect. The demand, particularly for apartments, is and has been pretty stable and I can point you to any number of reports that show downtown can absorb another 3,000ish units of supply [[this of course, being before COVID). Although there are a number of inter-related variables at play, the single most driving factor has been increased construction costs due to a lack of sufficient construction labor. Now, these increased costs require higher rents to cover those costs and profit - to which there may not be demand at a certain price point but this is not a demand problem, it is a supply problem. All of this has been fairly common knowledge for anyone in or adjacent to the industry for some time now.

  18. #1893
    Join Date
    Sep 2019
    Posts
    322

    Default

    Quote Originally Posted by bigboat View Post
    It all comes down to market demand.
    But it's not demand, how many times does this have to be corrected? You people make these points like it's 2003 and office space and buildings downtown are still vacant, they're not. The city has a lower office vacancy rate than Chicago, Hotel vacancy is also extremely low, apartments in central Detroit constantly sell out. This is not a lack of demand issue, so please stop peddling this nonsense.

  19. #1894

    Default Hudsons Site

    Quote Originally Posted by Metro25 View Post
    But it's not demand, how many times does this have to be corrected? You people make these points like it's 2003 and office space and buildings downtown are still vacant, they're not. The city has a lower office vacancy rate than Chicago, Hotel vacancy is also extremely low, apartments in central Detroit constantly sell out. This is not a lack of demand issue, so please stop peddling this nonsense.
    OK, then why was the Monroe Block development stopped after nothing was done and we have been told it is in for re-design. The Hudsons development is also delayed and now even scaled back as there were concerns the income that would come in could not support such a large investment. The foundation is almost completed and that does not change much between an 800' tower and a 680' tower. They have not touched the tower portion since work resumed, I would think the next phase could be started with different construction workers.

  20. #1895

    Default

    There’s definitely demand for office and residential in downtown, the demand just isn’t strong enough to support highrise construction for either with current construction costs and rents. I don’t really see how this can be argued. If there was, these 2 projects wouldn’t be moving so slow and there would be more like them under way.

  21. #1896

    Default

    I've seen no evidence of progress on the tower side post-COVID 19. There has been activity on the tower side, but it's assembling and storing rebar that is for the block side.

  22. #1897

    Default

    Quote Originally Posted by JK313 View Post
    There’s definitely demand for office and residential in downtown, the demand just isn’t strong enough to support highrise construction for either with current construction costs and rents. I don’t really see how this can be argued. If there was, these 2 projects wouldn’t be moving so slow and there would be more like them under way.
    Correct.

  23. #1898

    Default

    It was fortunate for Bedrock they didn't try to move forward with Monroe Block simultaneously. Nobody knows if this work-from-home thing will become a trend enough to influence a significant portion of office demand.

  24. #1899

    Default

    Quote Originally Posted by 401don View Post
    It was fortunate for Bedrock they didn't try to move forward with Monroe Block simultaneously. Nobody knows if this work-from-home thing will become a trend enough to influence a significant portion of office demand.
    I'm curious how this shakes out. Frankly, this will quite possibly have big negative consequences for downtown's across the country.

    This has basically just accelerated WFH which had already been starting up. Then you have companies like Twitter now saying employees can WFH forever and Facebook also having progressive WFH policies going forward.

    Obviously that'll impact office demand. Specifically in Detroit it'll be fascinating. Gilbert obviously has an image of his companies as young and hip... and he sees what other big tech is doing. He may want follow them.

    However... Gilbert has massive real estate investment downtown and undoubtedly having many employees home will have significant ramifications. Now he's basically paying himself with Rock tenants, but if those offices need less folks then he'll just have much more unused office space downtown in general.

  25. #1900

    Default

    Quote Originally Posted by stinkytofu View Post
    I'm curious how this shakes out. Frankly, this will quite possibly have big negative consequences for downtown's across the country.

    This has basically just accelerated WFH which had already been starting up. Then you have companies like Twitter now saying employees can WFH forever and Facebook also having progressive WFH policies going forward.

    Obviously that'll impact office demand. Specifically in Detroit it'll be fascinating. Gilbert obviously has an image of his companies as young and hip... and he sees what other big tech is doing. He may want follow them.

    However... Gilbert has massive real estate investment downtown and undoubtedly having many employees home will have significant ramifications. Now he's basically paying himself with Rock tenants, but if those offices need less folks then he'll just have much more unused office space downtown in general.
    Some office space could always be converted to residential. The whole WFH is likely to gain steam now simply because this situation proves it can work for a lot of jobs, and frankly because a lot of workers want it.

    That being said, the COVID situation will go away at some point. And when it does, urban living and lifestyle will return. There is a growing number of people who prefer the walkable urban lifestyle. And many of those people may choose to WFH, while still residing in greater downtown. For that reason, long term I would bet more on the residential space and less on the office space demand. And even if the current office space is held equal, there is still plenty of room for growth long term for residential.
    Last edited by Atticus; May-24-20 at 07:40 PM.

Page 76 of 143 FirstFirst ... 26 66 71 72 73 74 75 76 77 78 79 80 81 86 126 ... LastLast

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •  
Instagram
BEST ONLINE FORUM FOR
DETROIT-BASED DISCUSSION
DetroitYES Awarded BEST OF DETROIT 2015 - Detroit MetroTimes - Best Online Forum for Detroit-based Discussion 2015

ENJOY DETROITYES?


AND HAVE ADS REMOVED DETAILS »





Welcome to DetroitYES! Kindly Consider Turning Off Your Ad BlockingX
DetroitYES! is a free service that relies on revenue from ad display [regrettably] and donations. We notice that you are using an ad-blocking program that prevents us from earning revenue during your visit.
Ads are REMOVED for Members who donate to DetroitYES! [You must be logged in for ads to disappear]
DONATE HERE »
And have Ads removed.