Quote Originally Posted by Khorasaurus View Post
I'm talking about building an entirely new pedestrian bridge, not extending the existing one. With 2.7 billion dollars, building a new one should be a drop in the bucket.
You mistake MDOT for a multi-modal transportation agency.