I am glad that I had made this prediction back in 2018
Printable View
It's hard to say what constitutes a "level" at the very top few floors, but I think the floor plate for level 44 is laid [[based on the recently posted drone video).
My post on September 25 of this year [[post #3371) has a diagram of the floor plates.
I'd say we have about 8 or 9 floors to go, but starting with the current floor, they get really small and at this point the only thing preventing them all from getting done asap is the speed at which concrete can cure in the cold.
If Edition is really a luxury brand similar to Ritz-Carlton I wish they had just went with Ritz, something that already has recognition and prestige. They're both Marriott. I realize the wealthy just stay in the best hotel downtown and there really won't be anything comparable so it probably won't hurt business.
Update as of 11/22:
Attachment 42896
Nice to see the street-level view of the buildings during the coverage of the Thanksgiving Day Parade. Looking good!
Updates as of 12/3:
Attachment 42939
Attachment 42940
Another great video from Motor City Aerial!
https://www.youtube.com/watch?v=PdV6C0VaAt8
Can't say I love it or hate it yet. But man does MC Aerials make some nice content.
The Hudson's tower from West Alexandrine... Pure Detroit image. Looks like it is at or near the 680 ft. point.
I would love to see Bedrock purchase the old Wayne County Building and bring it back to life
Update as of 12/20:
Attachment 42951
Wasn't this thing supposed to be topped out by end of the year?
Probably but it's extremely close. Hard to tell from the photos but it looks like they've reached the final setback.
Typically when they reach a setback, there's a delay of a couple weeks while they reconfigure everything, particularly when such a setback involves a change to the core.
Here's the diagram. We're at level 46 or 47
Attachment 42952